Weather Delay Days by Metro

How many workdays earthwork and foundation crews lose to weather, metro by metro — from ten-year NOAA station baselines, scored against each location’s soil rather than rainfall totals alone. Enclosed and vertical work is not modelled.

Why rainfall totals mislead

An inch of rain costs a sand site nothing and a clay site three days. The column that matters below is not rainfall — it is lost workdays, which is rainfall put through a soil-specific drying model. Metros are ranked worst first.

Metro Soil Worst month Lost workdays that month Rainfall / yr
Minneapolis, MN Silt January 20 33.6″
Pittsburgh, PA Clay January 19 42.3″
Detroit, MI Clay January 19 40.0″
Chicago, IL Clay January 19 35.7″
Milwaukee, WI Silt January 18 35.3″
Portland, OR Silt January 18 43.2″
Cleveland, OH Clay January 17 31.8″
Newark / North Jersey, NJ Silt January 17 55.2″
Columbus, OH Silt January 17 43.0″
New Orleans, LA Clay July 17 76.0″
Seattle, WA Silt November 17 38.4″
Atlanta, GA Clay January 16 56.1″
Birmingham, AL Clay January 16 57.7″
Indianapolis, IN Silt January 16 46.0″
Boston, MA Silt January 16 43.4″
Hartford, CT Silt January 16 44.8″
Nashville, TN Clay January 15 52.5″
Richmond, VA Clay January 15 49.1″
Charlotte, NC Clay January 15 46.3″
Washington DC / NoVA, DC Clay January 14 46.5″
Baltimore, MD Clay January 14 44.8″
Raleigh-Durham, NC Clay January 14 51.0″
Philadelphia, PA Silt January 14 48.8″
Memphis, TN Silt January 14 58.9″
Houston, TX Clay January 14 56.5″
Boise, ID Silt December 14 15.6″
St. Louis, MO Silt January 13 44.2″
Dallas-Fort Worth, TX Clay May 13 44.4″
Oklahoma City, OK Clay May 12 33.0″
Salt Lake City, UT Silt January 12 18.0″
Sacramento, CA Clay January 12 20.5″
Kansas City, MO Silt January 11 31.1″
Austin, TX Clay May 10 32.7″
Denver, CO Silt May 10 14.2″
Tampa, FL Sand August 10 53.6″
San Antonio, TX Clay May 9 25.3″
Jacksonville, FL Sand July 9 56.0″
Orlando, FL Sand July 9 60.3″
Virginia Beach, VA Sand May 7 61.0″
Miami, FL Sand August 7 55.1″
Charleston, SC Sand August 7 46.1″
Savannah, GA Sand June 6 48.2″
Los Angeles, CA Sand January 4 15.5″
Phoenix, AZ Sand February 2 8.6″
Las Vegas, NV Sand January 1 3.4″

Minneapolis, MN currently tops the list: 20 unworkable workdays in January. Rainfall alone would not have told you that — several wetter metros lose fewer days because the water drains.

Note how often the worst month is a winter one rather than the wettest. Frontal rain arrives spread out and each event collects its own drying tail; summer storms cluster, and their tails overlap. The same rainfall costs more when it is spaced out, which is why totals mislead. The full write-up is here, including where these figures disagree with a published state contract baseline.

How to read these

Each metro page carries the full monthly table: the ten-year mean (the number to carry in a bid), the median, and an abnormality threshold set at the mean plus one standard deviation. Exceeding a mean is the expected case in roughly half of all periods and is not by itself evidence of abnormal weather; the threshold is the stronger basis for a claim.

These are monthly figures and should not be summed into a year. Each month assumes a site in the condition it is in that month. Adding twelve together would assume a jobsite never improves — no stone haul roads, no stabilised pads, no ditching — which is wrong for any project past its first few months. Over the two-to-four week window a delay claim actually covers, the effect is negligible. Over a year it is not, so we do not publish an annual figure.

Every page names the NOAA station it used and its distance, the soil basis and the effective drying constant, so the figures can be checked rather than taken on trust.

A metro average is not a jobsite

These use a metro centroid and a representative soil. Your site has a specific station, a specific soil, and specific dates. Enter a ZIP and the estimator runs the same model against all three and returns a contract-ready exhibit. Free, no account.

Run it for your ZIP

Baselines rebuilt September 15, 2026. Figures model soil-dependent site work — earthwork, grading, excavation, foundations and underground utilities. Enclosed and vertical work is not modelled. Planning figures from station observations and a deterministic soil model, not site-specific geotechnical findings.

Frequently asked questions

How are these numbers calculated?

Each metro is run through the same model as our paid exhibits: ten years of daily NOAA GHCND station observations, walked day by day, with a soil-specific drying clock. A Monday-to-Friday day counts as lost when precipitation exceeded 0.1 inch, the ground had not finished drying, or the ground was frozen.

Why do two metros with similar rainfall differ so much?

Soil. Rain leaves a sand site almost immediately and sits on a clay site for days. Two metros with the same annual rainfall can differ by 50 or more lost workdays a year purely on drainage class, which is why rainfall totals alone are a poor proxy for schedule impact.

Can I use these figures in a bid?

They are sound planning figures for a metro. For a bid or a claim, run your actual jobsite ZIP: the estimator uses the station nearest the site and your soil rather than a metro centroid, and returns a documented exhibit.